Separate past and future
Use a later holdout period and prevent closely related records from the same lot leaking between sets.
MANUFACTURING / PROVE
Select one line or asset group and one goal: quality investigation or anomaly notification. Can the team assemble useful investigation evidence sooner than with the current workflow?
Explore the delivery scope ↓Conceptual data-to-operation flow, adapted to the agreed project scope.
THE DECISION TO MAKE
Select one line or asset group and one goal: quality investigation or anomaly notification.
A PoC should produce evidence for the next investment decision. Business owners, data owners and users agree on normal tasks and exceptions, rather than treating a working screen as proof of value.
INDUSTRY-SPECIFIC TESTS
Use a later holdout period and prevent closely related records from the same lot leaking between sets.
Review results by operating condition, product change and maintenance state.
Ask operators to inspect source records and explain the alert and next action.
BASELINE & ACCEPTANCE
| Candidate measure | Method |
|---|---|
| Traceability | Traceable lots divided by in-scope lots |
| Reporting effort | Active time from source collection to reconciled report |
| Defect rate | Agreed defect count divided by inspected quantity, with a fixed retest rule |
| Candidate measure | Method |
|---|---|
| Alert workload | Notifications requiring review per asset per day |
| Actionable lead time | Time available before intervention is needed |
| Useful detections | In-scope events detected within the agreed window |
Set targets from your own baseline. Hold evaluation evidence separate from tuning and fix the assessment period and scope. Record failures, abstentions and untested conditions alongside successes.
GO / REVISE / STOP
If traceability is poor, alert review increases effort, or events are insufficient to evaluate, prioritize data capture or rules-based monitoring.
Core criteria pass, with owners, interfaces and remaining issues understood.
There is a promising signal but insufficient coverage; define a bounded follow-up.
Value does not exceed the baseline; compare data cleanup or improvements to existing tools.
The PoC scope defines the workflow, source material, environment, evaluation and prototype/report deliverables. Production development is a separate decision.
QUESTIONS BEFORE YOU START
Yes. Start with production and inspection reconciliation. Predictive maintenance needs a separate assessment of sampling and event history.
No fixed reduction is promised. First validate traceability and investigation effort, then evaluate quality interventions through plant trials.
YOUR OPERATION / OUR STARTING POINT
Tell us about the workflow, systems and reporting or documents that need attention. We will define a suitable phase, deliverables and assumptions.
Manufacturing — discuss your project How scope and estimates work ↗